How-to — — by Mahmoud Zalt

How Taskade's project views work, which ones sit in the toolbar, what each needs to be useful, and how to set the default view for a project.

The thing that confuses people about Taskade is not any single view. It is the fear that switching will rearrange their work, so they pick one view on day one and never touch the others.

It will not rearrange anything. Taskade stores a project as a tree of nested items, and each view is a different way of drawing that same tree. Understanding that one fact makes every view make sense at once.

That design has a practical consequence worth knowing before anything else. If a task looks wrong in Board view, it is wrong in List view too, because there is only one copy. You never have to keep two views in sync.

How do you switch views in Taskade?

Open a project and use the buttons at the top. Taskade puts four views in the toolbar as tabs and keeps the rest in a More Views menu next to them.

To make a view the one that opens every time, double-click its icon. That sets it as the default for the project, which is worth doing for any project you open daily.

What is each Taskade view actually for?

The names are familiar, but a couple of them behave differently from the tool you know them from. Here is what Taskade documents for each.

ViewWhere it livesBest for
List / OutlineToolbar tabHierarchical task organisation with unlimited nesting
Board / KanbanToolbar tabMoving work through stages as cards in columns
TableToolbar tabSpreadsheet-style work with filtering and grouping
Mind MapToolbar tabBranching ideas outward from a central concept
CalendarMore ViewsScheduling and deadlines across a day, week, or month
Gantt ChartMore ViewsTimelines, start and end dates, and sequencing
Docs (Beta)More ViewsA document-style canvas for long-form writing
ActionsheetMore ViewsA simplified spreadsheet-style list
Org ChartMore ViewsShowing a hierarchy of teams or processes

The one that earns the most praise from people who have used the product is Mind Map, because it turns a brainstorm directly into nested tasks instead of leaving you to retype them. That is the view most other project tools do not have.

List view deserves a note too. Because nesting is unlimited, an outline can hold a whole plan at several depths without needing sub-projects, which is a genuinely different way of working from tools that force a flat task list.

Why does a view look empty or wrong?

Almost always because that view needs a field your tasks do not have yet. The data is fine, the drawing just has nothing to draw with.

Does the mind map really turn into tasks?

Yes, and this is the part worth understanding properly, because it is the difference between Taskade's mind map and a drawing tool.

A branch on the mind map is the same item as a line in the outline. Add a child branch and you have added a nested subtask. Switch back to List and it is sitting there, indented, in the position you put it.

That means a brainstorm is not a separate artefact you later have to transcribe into a plan. It is the plan, drawn differently. Reviewers who have used the product regularly single this view out, and it is the most common reason people pick Taskade over a more conventional task tool.

Does everyone on the team have to use the same view?

No, and this is one of the quieter benefits of the shared-data design. A view is how you are looking at the project, not a setting you impose on the project.

So the person running delivery can sit in Board while the person planning sits in Mind Map and the person chasing deadlines sits in Calendar, all on the same project, with nobody converting anything. The default you set with a double-click is about which view opens first, not which view is allowed.

Which views are on a paid plan?

Some views are gated. Taskade's own learn material marks several of the More Views entries, including Org Chart and Actionsheet, as paid-plan features, while List, Board, Table, and Mind Map are available without paying.

The exact gating has shifted over time and their published pages are not perfectly consistent about it, so check the current pricing page before you build a workflow that depends on one specific view being free.

How to pick a view without overthinking it

Match the view to the question you keep asking about the project, not to the kind of project it is.

There is a limit to how much any view can do, though, and it is worth naming. A board tells you a task has been sitting in the same column for nine days. It does not move it.

When the tracking is not the problem

Taskade is genuinely good at showing the same work from different angles, and the mind map in particular is a real reason to choose it. If your problem is that you cannot see your work clearly, these views will fix that.

If your problem is that the work is visible and still not getting done, a view will not help. That is the gap we build for at Sistava: instead of a card that waits for you, you hire an AI Employee, tell it in plain English what you want handled, and it does the task rather than tracking it.

FAQ

How many views does a Taskade project have?

Taskade documents nine: List or Outline, Board or Kanban, Table, Mind Map, Calendar, Gantt Chart, Docs in beta, Actionsheet, and Org Chart. The first four sit in the toolbar as tabs and the rest live under the More Views menu. The exact line-up changes as views are added or promoted out of beta.

Does switching views in Taskade duplicate my tasks?

No. All views read the same underlying tree-structured project data, so switching only changes how that data is drawn. There is one copy of every task, which means no syncing and no risk of two views disagreeing.

How do I set a default view for a Taskade project?

Double-click the icon for the view you want. That sets it as the project's default so it opens in that view next time. This is per project, so a planning project and a delivery project can open in different views.

Why is my Taskade calendar view empty?

Calendar view places tasks by their due date, so tasks without one do not appear. Add due dates to the tasks you want scheduled and they will show up. The same underlying dates also improve the Gantt chart, so it is worth doing once properly.

Why does my board only have one column?

Board view organises tasks into columns using a grouping field. Until you set that grouping, everything sits together. Choose the field that represents your stages, such as a status field, and the columns appear straight away.

Are all Taskade views free?

Not all of them. Taskade's learn material marks several More Views entries, including Org Chart and Actionsheet, as paid-plan features, while List, Board, Table, and Mind Map are available without paying. Their published pages have not always agreed on the exact gating, so check the current pricing page.

Sources